groundwater development project

Borehole site investigations followed by supervision of exploratory pilot hole drilling, supervision of production well construction and design of the production wells. Carried out test pumping of all production wells and analyzed data. A total yield of 430L/S was realized from 20 production wells. Individual yield of wells ranged between 3 – 68 L/S

  • Client
    Kembe Farms
  • Location
    Chisamba
  • Size
    430L/S
  • Year Completed
    2019
  • Categories
    Commercial